Mike and I have been wanting to get rid of the linoleum in our upstairs bathrooms for a long time now. We had the same linoleum in our kitchen and dining room, and I was so glad when we replaced it with laminate flooring 2 or 3 years ago. It just never looks clean. I could scrub it by hand and you wouldn't know the difference between that and not cleaning it for three weeks.
Anyway, Mike finally had some time this last weekend, so we decided to tackle the project - ourselves. It began last Wednesday evening. I cleaned out our master bathroom (cabinets, and took stuff off the wall). After we put the kids to bed, we took out the mirror, toilet, sink, and vanity, then pulled up the linoleum floor, and the plywood (and all the staples) on top of the sub floor. We didn't get all the way done with the demolition that night. But we made a good start.
Thursday after I came home from work, I finished demoing the master bathroom, and cleaned out the main bathroom. Again, once the kids were in bed, we took out the mirror, sink, toilet, and vanity, pulled up the linoleum floor, and began to take the plywood off the sub floor. Again that night we didn't finish all of the demo but made a good start, and went to bed late.

Friday, Mike had the day off of work, and I came home at 11:00 and was done for the day. Mike had finished demoing the main bathroom, and we were ready to start some new projects. We removed light fixtures, and prepped for paint. Next, we painted the walls in both bathrooms. Then we began to lay out tiles on the floor to see how they would line up and fit, and to find out what cuts we needed to make. Mike lined up the master bathroom. It laid out well (it was square), and was fairly easy to see what cuts needed to be made. That evening (just as I was loosing steam) Mike's family stopped by. Mike's sisters had been in Price for the week, and on Thursday night left their kids in Price with Mike's parents and did a girls night. Our home was the meeting place for the family on Friday. Luckily they brought dinner and gave me a break, when I needed on the most.
After the family left, I had Mike get the kids to bed and I made a run to Home Depot to look at a counter top and sink. I was also to rent to tile saw. It took me about an hour to run the errand. And then when I got home, Mike had no idea how to use the tile saw. I couldn't believe he made me go and get it when he didn't know how to use it. In the end, it wasn't hard to figure out and we were okay.
That night was girls night, and although I had planed to go, I never did make it. But I talked to Melinda on the phone and she suggested that we just make the cuts that night, and actually lay the tile on Saturday. What good advice!!! It was 2:00 before we went to bed, and were not done with all the cuts. The main bathroom is not square and gave us a little headache!

We were slow to start Saturday morning, but progressed anyway. We made the final cuts for the main bath and then laid the master bath. The master bath was great. It is fairly small, but as I said before, it is also square, so it went in quickly (it was done by 3:00 - it took about 1 hour and 15 minutes to lay it). Next was the main bath. The main bath is a little larger. That room is not square, and I didn't lay it out enough. We have a few errors in there. The worst is that they are in the middle of the room, but it's not terrible, and it is better than the linoleum!! We got done just after 5:00. It was time to clean up and be on the road. I was meeting up with my family (my parents were in town for less than 24 hours).

Sunday brought some quick grouting, and Monday we sealed the tile by the master bath toilet, and set the toilet.
More to come, because the rooms aren't done yet. But hopefully before we leave on Friday.